Pomerania does not need another map of investments. It needs a map of their combined impact

Nuclear power, offshore wind, grids, ports, gas, hydrogen and a possible polyhalite mine are changing the same region. Each project has its own schedule, procedures and analyses. Yet residents, local authorities and the local economy will experience their effects at the same time.

Pomerania’s problem today is not a shortage of major investments.

Its problem may instead be their sheer number — if we plan each one in isolation.

The nuclear power plant at Lubiatowo-Kopalino. Offshore wind farms. New 400 kV lines. Ports and offshore support bases. The FSRU terminal. Hydrogen projects. And now also the polyhalite mining project in the Puck area, which KGHM Polska Miedź S.A. is evaluating.

Each of these projects has its own investor, schedule, procedures, environmental assessments and communications.

But there is only one Pomerania.

The same road and rail infrastructure may serve several projects. The same labour market will have to supply specialists for different sectors. The same local authorities will face changes in housing, schools, public services, tourism and land use.

And the same resident does not experience PSE’s grid investments, offshore wind, nuclear power or a potential mine separately.

They experience the combined impact.

The transition is taking physical shape

Just a few years ago, we saw much of Pomerania’s energy future on maps and in presentations.

Today, we increasingly see it on the ground.

Baltic Power has delivered its first power from the sea to the national grid. The electricity flowed into onshore infrastructure in the municipality of Choczewo. At the time of the announcement, more than 50 of the planned 76 turbines were already installed at the wind farm site.

Bałtyk 2 and Bałtyk 3, developed by Equinor and Polenergia, reached another milestone in September: installation of the foundations for all 100 turbines and for two offshore substations was completed. The two projects will have a combined capacity of 1.44 GW.

On 17 September, Polskie Sieci Elektroenergetyczne (PSE), in turn, announced that it had secured the full set of key administrative decisions needed to build the extra-high-voltage infrastructure that will transmit power from offshore wind farms.

The Choczewo substation is already in place. Part of the infrastructure is in use, and further lines are under construction.

So Pomerania’s energy transition is no longer a map of future investments. It is becoming the region’s physical infrastructure.

Nuclear power is also a question about the local economy

A similar moment has come at Lubiatowo-Kopalino.

In August, the site of the future nuclear power plant was handed over to the main contractor — Bechtel. The next stage of preparatory works and earthworks has begun.

The Ministry of State Assets (MAP) explicitly described this stage as an example of “local content in practice”, pointing to opportunities for Pomeranian companies and to the development of domestic and local supply chains.

And this is where a question arises that goes beyond any single project.

Is the regional market of companies, workers and skills ready to seize, all at once, the opportunities created by nuclear power, offshore wind, grids, ports and further major projects?

Because the local content of one project may compete with the local content of another for the same people and the same resources.

But it can also create synergies.

The PUCK project complicates — and enriches — the picture even further

Added to this jigsaw is the PUCK project by KGHM Polska Miedź S.A., which concerns the possibility of mining polyhalite in the Puck area.

According to the local authority, the potential resources may amount to around 300 million tonnes, output could reach up to 4 million tonnes a year and capital expenditure up to PLN 10 billion, while the investment itself could create as many as 800 jobs, with more in the wider economy around the project.

It must, however, be stated very clearly: no decision to build the mine has been taken.

The letter of intent signed in July by KGHM and the regional government of the Pomeranian Voivodeship launches a phase of further analysis covering, among other things, the environment, technology, transport and logistics.

And it is transport that is particularly interesting here.

Because the project does not emerge in an economic vacuum.

It emerges in a region where nuclear power, offshore wind, transmission grids, ports and energy infrastructure are developing in parallel.

Everyone can get the sums right for their own project. But who will add up the total?

In my view, this is one of the most important questions for Pomerania over the next decade.

The problem begins when every investor correctly calculates the impact of its own project, yet no one sees early enough what is taking shape between the projects.

A road cannot tell a lorry bound for the nuclear power plant from traffic serving another project.

The labour market does not create a separate pool of engineers for each investor.

The housing market does not know which project brought in several hundred new workers.

Nor does a resident divide their daily life according to the organisational structures of investors.

That is why, alongside impact assessments of individual projects, we need to look at the cumulative impact of the transformation of the region as a whole.

Pomerania’s 2035 strategy creates the right moment

On 8 September, the Board of the Pomeranian Voivodeship adopted the draft Development Strategy of the Pomeranian Voivodeship 2035.

Consultations began a day later and will run until 8 January 2027.

On 23 September, a series of regional conferences begins in Malbork. Further conferences will be held in Chojnice, Bytów, Lębork, Słupsk, Kościerzyna and Gdynia, among other places.

Alongside the question “which investments will be built?”, this is a good moment to ask another:

“What will the region look like when they all start operating at the same time?”

Pomeranian Cumulative Impact Map

This is not about creating another document that will end up on a shelf.

Rather, I envisage a living map of the cumulative impact of strategic investments — the Pomeranian Cumulative Impact Map.

It should bring together at least seven areas:

1. Transport and logistics Roads, rail, ports, heavy haulage, delivery infrastructure.

2. Labour market The number and profile of workers needed, competition for specialists, labour migration.

3. Housing and public services Housing availability, schools, healthcare, public transport and pressure on local authorities.

4. Skills and education Technical education, universities, retraining and the skills of the future.

5. Local supply chains How much value can actually stay in Pomerania, and where local companies can serve more than one sector.

6. Environment and tourism Not only the impact of a single project, but also the cumulative change in how the area functions.

7. Social acceptance Dialogue, transparency, residents’ participation in decision-making and the management of the social risk of investments.

For each area, three questions should be asked:

What will one project change? What will they all change together? Where is there a risk of overload — and where an opportunity for synergy?

Because cumulative impact does not mean cumulative risk alone

This is very important.

A shared view can reveal problems that are invisible from the perspective of a single investor.

But it can also show opportunities that no single investor will seize on its own.

Shared infrastructure.

Better use of rail.

New study programmes serving several industries at once.

The growth of Pomeranian companies serving the nuclear, offshore wind, port and energy sectors.

A stronger research base.

New services.

More value retained in the region.

PCHET – Polish Conference for Hydrogen Energy and Technologies: the next conversation is already beginning

On 29 September, Gdynia will host PCHET – Polish Conference for Hydrogen Energy and Technologies 2026.

One of the panels is devoted specifically to Pomerania — its resources, its infrastructure and the feasibility of deployment. The agenda includes salt caverns, ports, the refinery, offshore wind, grid constraints, storage, logistics and the local value chain.

This shows that the conversation about the links between projects is already beginning.

It is worth taking the next step.

Not just connecting technologies. Connecting their impact on the region.

Because major investments change not only the energy landscape.

They change people — their everyday lives, opportunities, sense of security and prospects.

And a well-managed transition should be able to see both.

Pomerania could become a laboratory for this approach: a region that not only delivers several strategic investments at once, but knows how to manage their combined impact.

If this succeeds, Pomerania’s greatest innovation of this decade may not be any single technology.

It may be the ability to bring them all together into one well-managed change.

Sources and further reading

First published in Polish on LinkedIn, 23 September 2026.

More analyses

Before the crisis breaks

“It was not mine.” Ed Sheeran is left on his own — but can reputation be handed to a promoter?

Macklemore was dropped from the tour. Then every announced support act withdrew, and Beoga, who played during part of Sheeran’s own set, also pulled out. Yet the media very quickly stopped telling the story as the promoter’s crisis. This is a case about the difference between formal authorship of a decision and reputational responsibility for its consequences.